We find the best sites in Switzerland for a datacenter — and get it built.

Site screening, grid connection, permitting, heat integration and delivery. From the first parcel screen to an energised building.

Start an enquiry
coolingpowerheathallExpansionPhase 2 · reserve≥ 3 ha contiguousIndustrial zoneParcel boundaryWhite space6 rack rowsCDU55–60 °C supplyElectrical roomMV/LV · UPSRaised floorCold aisleDLC loopSupply / returnBuried cable · 110 kVDry coolers N+1dry rejectionGrid connection110 kV lineSubstation110/16 kVAnergy network8–28 °CHalldirect-to-chipStructureSteel frame
Hover to isolate a system
HallCoolingPowerHeat
DrawingFig. 01 — Schematic isometric
SchemeLiquid-cooled hall · direct-to-chip
StatusDesign basis · not to scale
ReferenceLV95 / CH1903+
01 / Mission

Sovereign infrastructure is a siting problem before it is a policy one.

01

Some data cannot leave.

Hospitals, banks, insurers and public bodies hold records they are not free to place under another jurisdiction.

02

AI demand is compounding. Swiss capacity is not.

Each model generation draws more power per rack, and the buildout to match it has not arrived here.

03

A guarantee is only as good as the ground under it.

Jurisdiction is settled by a parcel, a grid connection and a consent — not by a clause in a contract.

02 / Process

From first screen to energised building.

01

Siting

Zoning · flood · groundwater · noise · contaminated land

02

Power

Grid level · spare capacity · connection cost

03

Permitting

Building permit · noise envelope · efficiency agreement

04

Heat

55–60 °C into district and anergy networks

05

Connectivity

Two diverse duct entries · carrier and dark fibre

06

Delivery

Cooling architecture · procurement · commissioning

03 / Contact

If you are weighing a site, a connection or a business case.